Lidl Wilton

CTS Group have successfully completed the mechanical and electrical installation in the new LIDL store Wilton, Co Cork. The project was completed in twelve weeks.

The mechanical installation consisted of ventilation system, driven by a Mark eire AHU, water services, mains, water storage, soils and wastes, air conditioning throughout the staff welfare facilities, gas main installation, booster pump set, three number Heatrae Sadia water heaters, three air curtains, at exits and entries to the store.

The electrical installation consisted of 800 metres of containment, general and emergency lighting, MV, LV and ElV systems, including: category 6a data network, fire alarm., intruder alarm, BMS comprehensive. General services consisted three phase fixed appliances, single phase appliances and single phase general outlets.

Life safety systems involved the installation of the fire alarm, emergency lighting, disable refuge alarm, disable toilet and gas detection system.

All these systems were installed, tested, verified, commissioned in a timely manner for a hand over to the client.