Northgate Medical Centre New Ross

Encompassing a three story medical centre, offices and a pharmacy, the provisions of electrical services for this development were planned in conjunction with the architects at design stage. In addition to general services, the electrical fit out for this build required specialist antiglare, alongside both medical and emergency lighting. The completion time for the project was 16 weeks.

Systems specific to the projects requirements include an addressable fire alarm, access control, digital CCTV and a disabled alarm system. The provision of data services is achieved with the inclusion of a server cabinet, CAT 5E structured cabling system and strategically placed data points