Lidl Claremorris

CTS Group were delighted to recently hand over Lidl Claremorris after the completion of the M&E contract. This mechanical and electrical fit-out involved a full new installation to the 2,268m2 retail store.

The electrical general services included the provision of distribution boards and sub maisn cabling supplying power to the whole store along with site services such as site lighting. Internally, power was provided to all machinery and equipment in the bakery and throughout the store. All general services such as switches, sockets, spurs, dado trunking, hand dryers, data wiring for the tills, wiring for access control, roller shutters and all mechanical wiring were installed. 

Mechanical provisions included the installation of a new air handling unit to service the whole store. Specialist ductwork, grilles, dampers and VCDs were installed as per the engineer's specification and air conditioning units were wired and installed along with a gas boiler and gas detection system.

All installed systems were tested and commissioned. A full Operations and Maintenance Manual including commissioning certificates and As-Built drawings were produced for the handover of the premises to the client. 

We wish Lidl Claremorris every success with this new and exciting retail store!